• About Us
  • Our Commitment
  • Divisions
    • Hamilton Divisions
    • Alaska Division
    • Oregon Division
    • Greater Western US
    • Rail Division
    • Washington Division
  • Join Our Team
    • Join Our Team
    • Current Openings
    • Apprenticeship Programs
    • Careers Defined
  • Employee Resources
  • Contact Us
hamil.com
  • About Us
  • Our Commitment
  • Divisions
    • Hamilton Divisions
    • Alaska Division
    • Oregon Division
    • Greater Western US
    • Rail Division
    • Washington Division
  • Join Our Team
    • Join Our Team
    • Current Openings
    • Apprenticeship Programs
    • Careers Defined
  • Employee Resources
  • Contact Us
Edwards, Colorado

US 6 Lake Creek Replacement

This project included the replacement of the existing bridge across Lake Creek. The new bridge is a 100-foot-long, single-span precast girder bridge with precast deck panels and cast-in-place topping slab on driven pile foundation, with cast-in-place approach slab work and steel railing. The project included detour embankment and roadway grading/paving, landscaping, bridge demolition, traffic control, drainage features, and wood fence for adjacent pedestrian trail. Located in an environmentally sensitive area, spanning Lake Creek, containment was built to accommodate bridge demolition activities, and the stream was diverted to accommodate rip rap installation. 

Overall, the project exceeded expectations in various facets and produced an aesthetically pleasing and safe improvement for the travelling public. The project management team and contractor partnered to identify solutions to challenges through open communication and maintaining flexibility in solving problems. Hamilton took every opportunity to meet or exceed the Owner’s expectations, whether performing contract work or extra work. Hamilton’s superintendent was recognized by the Colorado Contractors Association and CDOT for excellence in project management.
Major Project Elements:
  • Bridge Construction
  • Contractor Designed and Installed Detour Bridge
  • Cold Weather Concrete Construction
  • Close Stakeholder Coordination
Picture
Awards:
  • 2016 Colorado Contractors Association (CCA)/CDOT Project Management Award
Picture
CORPORATE HEADQUARTERS: PO Box 659, Springfield, Oregon 97477   /   phone: 541-746-2426   /   Fax: 541-746-7635
ALASKA DIVISION: 12078 N. Glenn Highway, Sutton, Alaska 99674 [PO Box 309, Sutton, Alaska 99674]   /   phone: 907-746-5307
RAIL DIVISION: PO Box 659, Springfield, Oregon 97477   /   phone: 541-746-2426   /   Fax: 541-746-7635
WASHINGTON DIVISION: 1850 93rd Avenue SW, Olympia, Washington   /   phone: 360-742-3326   /   Fax: 360-742-3579
ABOUT US
About Us
Our Philosophy
The Reward of Work
​The Secret to Our Success
OUR COMMITTMENT
Safety
​Quality of Work
Environmental Stewardship
Community
DIVISIONS
​Hamilton Divisions
Alaska
Oregon
Greater Western US
​Rail
Washington
JOIN OUR TEAM
Join Our Team
Current Openings
Apprenticeship Programs
Careers Defined
Advantages
An Equal Opportunity Employer
​Employment Application
Employee Resources
Contact Us
Picture
© Hamilton Construction Co. All Rights Reserved. An Equal Opportunity Employer.
  • About Us
  • Our Commitment
  • Divisions
    • Hamilton Divisions
    • Alaska Division
    • Oregon Division
    • Greater Western US
    • Rail Division
    • Washington Division
  • Join Our Team
    • Join Our Team
    • Current Openings
    • Apprenticeship Programs
    • Careers Defined
  • Employee Resources
  • Contact Us