• About Us
  • Our Commitment
  • Divisions
    • Hamilton Divisions
    • Alaska Division
    • Oregon Division
    • Greater Western US
    • Rail Division
    • Washington Division
  • Join Our Team
    • Join Our Team
    • Current Openings
    • Apprenticeship Programs
    • Careers Defined
  • Employee Resources
  • Contact Us
hamil.com
  • About Us
  • Our Commitment
  • Divisions
    • Hamilton Divisions
    • Alaska Division
    • Oregon Division
    • Greater Western US
    • Rail Division
    • Washington Division
  • Join Our Team
    • Join Our Team
    • Current Openings
    • Apprenticeship Programs
    • Careers Defined
  • Employee Resources
  • Contact Us
Camas, Washington

BNSF Bridge 24.8 Fallbridge Subdivision

This complex accelerated bridge construction (ABC) project was an active rail slide-in-bridge replacement. Complete removal of the old bridge and the installation of a fully assembled new bridge and was completed within one 30-hour period.

The existing structure was replaced with one 202-foot-long through-truss span, two through-plate girder spans and two 41-foot-long precast box girder approach spans, one 60-foot deck plate girder, one 90-foot deck plate girder, and a new 203-foot-long truss span. The entire substructure of the new bridge was built under the existing bridge – just outboard of it. Drilled shafts, columns, and caps were all completed while the existing bridge continued to serve trains.

Hamilton developed a lateral translation system used for the bridge change-out. Temporary falsework and translation system members were also built under the existing structure. This was made possible by the two work bridges that were built on either side of the active bridge. A new truss and two through plate girder spans were erected on the work bridge. 

Hamilton was responsible for stakeholder management and collaborating with the Washington Department of Transportation (WSDOT), which had an adjacent bridge, and a Georgia Pacific line, which had utilities and pumps within the project limits. After extensive planning and coordination with BNSF, the change-out involved a shutdown of a BNSF mainline, the complete removal of the old bridge, and the installation of a fully assembled new bridge – all within one 30-hour work period – successfully limiting the overall impact to the BNSF rail network.​

Time lapse video for the BNSF 24.8 Bridge Replacement project.
Major Project Elements:
  • Accelerated Bridge Construction
  • Lateral Bridge Slide
  • Close Stakeholder Collaboration
  • Challenging Foundation Conditions
  • Close Coordination with Multiple Permitting Agencies
  • Close Proximity to Existing Highway Facilities
Picture
Awards:
  • Winner of the 2017 Best ABC Project Award
Picture
CORPORATE HEADQUARTERS: PO Box 659, Springfield, Oregon 97477   /   phone: 541-746-2426   /   Fax: 541-746-7635
ALASKA DIVISION: 12078 N. Glenn Highway, Sutton, Alaska 99674 [PO Box 309, Sutton, Alaska 99674]   /   phone: 907-746-5307
RAIL DIVISION: PO Box 659, Springfield, Oregon 97477   /   phone: 541-746-2426   /   Fax: 541-746-7635
WASHINGTON DIVISION: 1850 93rd Avenue SW, Olympia, Washington   /   phone: 360-742-3326   /   Fax: 360-742-3579
ABOUT US
About Us
Our Philosophy
The Reward of Work
​The Secret to Our Success
OUR COMMITTMENT
Safety
​Quality of Work
Environmental Stewardship
Community
DIVISIONS
​Hamilton Divisions
Alaska
Oregon
Greater Western US
​Rail
Washington
JOIN OUR TEAM
Join Our Team
Current Openings
Apprenticeship Programs
Careers Defined
Advantages
An Equal Opportunity Employer
​Employment Application
Employee Resources
Contact Us
© Hamilton Construction Co. All Rights Reserved. An Equal Opportunity Employer.
  • About Us
  • Our Commitment
  • Divisions
    • Hamilton Divisions
    • Alaska Division
    • Oregon Division
    • Greater Western US
    • Rail Division
    • Washington Division
  • Join Our Team
    • Join Our Team
    • Current Openings
    • Apprenticeship Programs
    • Careers Defined
  • Employee Resources
  • Contact Us